ADA Five Areas Project

ADA 5 Areas ProjectProject Overview

Americans with Disabilities Act improvements (curb, gutter, and sidewalks) in the following areas:

  • Area 1: E. 68th Ave. - Washington St. to York St.
  • Area 2: E. 66th Ave. - Washington St. to York St.
  • Area 3: Steele St. - Niver Creek Tr. to E. 86th Ave.
  • Area 4: E. 56th Ave. - Lincoln St. to Washington St.
  • Area 5: E. 55th Ave. - Lincoln St. to Washington St.

Project Cost:

  • Areas 1-4: $5,360,000
  • Area 5: $680,000

Project Schedule

  • Areas 1, 2, 4
    Engineering Design: Complete
  • Area 3
    Engineering Design: Mid 2021
  • Areas 1 - 4
    ROW Acquisition: 2021

Construction Schedule

One area per year 2021, 2022, 2023, or 2024

  • Area 5: Complete

Contact Information

Call 720.523.6875
Email